Hartham Leisure Centre
The £9m refurbishment project involves a new 2-storey extension, [...]
The £9m refurbishment project involves a new 2-storey extension, [...]
Over 300 lighting distribution boxes, and approx. 2000 Luminaire leads were installed on the project. Starter Distribution Boxes were provided in 2, 4 ,6 ,8, 10 and 12-way variations and Expansion Distribution Boxes in 2, 4, 6, and 8-way variations
Black Prota plug-in ceiling roses were put forward as an ideal solution. They were supplied prewired with black 5-core cable, complete with black decorative covers.
Flex7 lighting connection and controls were recently installed in the newest branch of ROAR Fitness Gym in South Kensington. At 6,500 Square foot, the extremely high-specification gym boasts London’s largest liquid metal wall in its reception area.
flex7’s energy saving lighting connection and control products have been installed as part of a recent upgrade to Southampton football club’s home changing room. The changing room was completely refurbished, and flex7 products were identified as providing the perfect solution for the connection and control of the new lighting layout.
flex7 Lighting connection and control products have been used in the recent £9.5m redevelopment of The Moy’s End Stand at Peterborough United football stadium. The project includes a 3000sqm specialist education centre, linked to the stand. The building was designed to reach a BREEAM excellent standard.
Flex Connectors energy saving lighting control and connection products have [...]