Walker Primary School
The 2-storey block replaced an old and unsuitable building. The new school buildings offers spacious classrooms, an IT Suite, Studio. The building achieved a BREEAM rating of ‘Very Good’.
The 2-storey block replaced an old and unsuitable building. The new school buildings offers spacious classrooms, an IT Suite, Studio. The building achieved a BREEAM rating of ‘Very Good’.
The store design included black exposed ceilings, so a discrete means of lighting connection was required. Prota plug-in ceiling rose was a perfect fit for the project. Available in black, complete with black cable it meant that there was no need to spend time spray painting products black before installation, as a workaround.
This project perfectly demonstrated how easy it is to upgrade or reconfigure a lighting installation using flex7 lighting connection and control products.
The Hotel Room Energy Management System is an energy-saving option for hotels that uses occupancy sensing to control power. Rather than using a keycard system, which can easily be overridden with a spare card so that power is kept on constantly, the system detects presence in the room.
The Pinnacle office building, Milton Keynes is to benefit from the installation of flex7 lighting connection and control products. The project has a mix of presence and absence detection throughout with flex7 plug-in switches used wherever appropriate.
flex7 ZoneLite lighting control modules and Scene Setting Plates were chosen for the project because it was decided that they were the best value option in terms of price and quality.
Qbic have developed a patented technique for building hotel bedrooms that takes them from an empty shell to a fully equipped bedroom in 6 hours. To help them to achieve this we developed a bespoke 25-way Lighting Distribution Box for the projects.
When the Sheraton Heathrow Hotel was refurbished the flex7 Hotel Guest Room Energy Management System was installed in all of its 426 bedrooms. The System guarantees substantial energy-saving
The System is prefabricated, and products simply need to be plugged together on site. This meant that the job could be completed in a fraction of the time it would take using traditional wiring methods.
The New North Wing is a £3.8 million, 4-storey building with an auditorium and 2 music rooms on the ground floor, and 18 en-suite guest bedrooms, spread over the remaining 3 floors.