Facepunch Studios Ltd
Birmingham’s tallest office block boasts 230,084 sq. ft of office space and stands 26 storeys high. The building has a BREEAM accreditation of Excellent and an EPC Rating A.
Birmingham’s tallest office block boasts 230,084 sq. ft of office space and stands 26 storeys high. The building has a BREEAM accreditation of Excellent and an EPC Rating A.
Over 300 lighting distribution boxes, and approx. 2000 Luminaire leads were installed on the project. Starter Distribution Boxes were provided in 2, 4 ,6 ,8, 10 and 12-way variations and Expansion Distribution Boxes in 2, 4, 6, and 8-way variations
Flex7 were chosen because the contractor wanted a system that was simple to install, from a company who would happily provide technical assistance on site if needed.
Presence detection was required in corridor and WC areas while office areas were all fitted with DALI absence detection. Using flex7 Starter Distribution Boxes and prewired luminaire leads meant that the installation could be completed quickly and efficiently
a key requirement for the project was a flexible lighting system, as all areas will be subject to change on a fairly regular basis.
Earlier this year we joined Made in Britain. A recent survey they carried out revealed that 91% of Brits felt it was important to buy British-made products. As a result, we decided that using the official Made in Britain marque on our website and literature was the simplest way to alert our customers to the fact that our products are indeed made in Britain.
More than 10,000 flex7 Single Socket Outlets and almost 8000 flex7 6-core Luminaire Leads have been used in the new £267m Midland Metropolitan University Hospital.
£42 million world-class National Treatment Centre, Highland. 24-bed inpatient rooms, 5 operating theatres and clinics and outpatient departments offering healthcare for bone, muscle and eye conditions.
Issue 2 of our lighting connection and control product [...]
The bus station has been opened up and modernised to improve customer experience, and ensure a safer and more comfortable environment for users. A customer survey identified lighting to be once of the main features that needed improvement. As a result the entire lighting system was upgraded, including the addition of new architectural lighting.