About Sam

This author has not yet filled in any details.
So far Sam has created 21 blog entries.

flex7 are in the Premier League

2021-11-02T10:46:20+00:00February 6th, 2020|

flex7’s energy saving lighting connection and control products have been installed as part of a recent upgrade to Southampton football club’s home changing room. The changing room was completely refurbished, and flex7 products were identified as providing the perfect solution for the connection and control of the new lighting layout.

 0

Flex7 increase efficiency of Radiotherapy Bunkers

2021-02-19T14:10:13+00:00July 17th, 2019|

flex7 have helped to dramatically increase efficiency of radiotherapy units at Musgrove Park Hospital, Beacon Centre using their ZoneLite Lighting Control Modules. The Hospital is one of many across the UK who have a specialist unit to treat cancer patients.

 0

Connect With flex7

2019-07-17T10:46:27+00:00August 6th, 2018|

In 1998 flex7 created the world’s first 7-pole lighting connection interface. Since then we’ve designed an entire connection & control system around these clever plug & socket modules. In this article we will be focusing on on the heart of our product range; our lighting distribution unit or, as we prefer, connection unit.

 0

Plug-in Switches from flex7

2021-09-27T09:53:04+00:00May 4th, 2018|

flex7 have developed a unique range of plug-in switches that operate at Protected Extra Low Voltage (PELV) and offer the installer dramatic time savings. Switches are connected using a lead with RJ11 connectors, one end plugging into the switch, the other into the flex7 control pack or ZoneLite unit.

 0

Changes to Scottish Energy-Efficiency Regulations

2017-10-17T14:35:30+00:00March 13th, 2017|

In September last year new regulations were brought into effect in Scotland. These regulations relate to the energy performance of large non-domestic buildings, and what can be done to improve them.

 0

Scottish Blood Transfusion Centre

2018-05-24T11:37:59+00:00January 27th, 2017|

flex7 were chosen to supply lighting connection and control products for the new headquarters of the Scottish National Blood Transfusion Service in Edinburgh. The new £33 million centre is based at Heriot-Watt Research Park, and incorporates offices, a cafe and state-of-the-art laboratories and research facilities.

 0

Bicester Community Hospital

2022-11-29T11:04:58+00:00May 27th, 2016|

flex7 lighting connection and control products were installed throughout the £5m Bicester Community Hospital Development.

 0

Premier Oil Offices

2018-05-24T11:39:43+00:00May 11th, 2016|

flex7 modular lighting connection and control products were used in phase two of a prestigious business park near Aberdeen.

 0

Coming soon

2021-08-16T10:09:04+00:00January 18th, 2016|

Case study awaiting client approval - available soon [...]